CRH1E EMU of Sleeper

Release time:  2018-12-17

             

•     Jointly designed by BST and BT Sweden based on the proven technology used on Regina EMU, CRH1 and CRH1B EMUs

•     Designed according to China electrified railway characteristics (rail, platform, catenary, clearance, power supply, signal and climate)

•     Consisting of 16 cars

•     Adoption of standard and modular design concept

•     Operation speed of 250km/h, highest testing speed of 275 km/h

•     Newly-designed streamlined cab

•     Newly-added doors for driver escape and for loading food onto the dining car